Assignment name:
Thac Ca 2 Hydropower Project
|
|
Country: Viet Nam
Location within country: Yen Bai Province
|
Duration of assignment (month): According to the real progress of the project
|
Name of Client: Xuan Thien Yen Bai Company Limitted
Name and email of the contact:
|
Total No. of man-months of the assignment: 25
|
Address of Client: Khao Mang comune, Mu Cang Chai district, Yen Bai province
|
Approx. value of the services provided by our firm under the contract:
|
Start date (month/year): 06/10/2015
Completion date (month/year): Ongoing
|
No. of professional staff-months provided by associated firm:
|
Name of associated Consultants, if any:/
|
Funding: 30% from Project Owner, 70% loan from VDB (Vietnam Development Bank)
|
|
|
|
Narrative description of project:
- Gravity concrete dam 23.0m long on the right bank, maximum height 17.50m. Embankment dam 26.0m long on the left bank, maximum height 13.50m;
- Spillway 60.0m long with 5 gate valve 12.0m wide, capacity 8957.3m3/s;
- Maximum water head 15.98m;
- Intake 139.91 m3/s; nxBxH = 2x7.5x7.5m;
- Power house : 1 Bulb units 1 x 14.50MW, rated head 11.82m;
- Annual production 49.75 GWh;
- 110kV transmission line 18.0km long.
|
Description of actual services provided by our staff within the assignment:
- Adjusted Master plan;
- Feasibility Study
- Technical design;
- Detailed design;
- Hydro-mechanical equipment manufacture drawing;
- Supervision of construction works.
|