Survey and Design Consultant

Mo Duc Solar Power plant

Mo Duc Solar Power plant

Mo Duc solar power plant uses US technology with 53,000 panels.


 

Assignment name:

Mo Duc Solar Power plant

Approx. value of the Contract:

125.000 USD

Country: Viet Nam

Location within country: Mo Duc district, Quang Ngai province

Duration of assignment (month): 40 days

Name of Client:

Thien Tan Construction Investment JSC

Total No. of man-months of the assignment:

 

Address of Client:

No. 172 Pham Van Dong st., Nghia Chanh, Quang Ngai City, Quang Ngai Province

Approx. value of the services provided by our firm under the contract: 125.000 USD

Start date (month/year): 25/05/2017

Completion date (month/year): 03/07/2017

 

Name of associated Consultants, if any: 504 Consultants and Construction Company Limited

Funding:

Narrative description of project:

  • 19,2MW capacity, located on an area of 24ha;
  • Annual total radiation: 1885.7kWh/m2/year
  • Annual production: 28.0GWh;
  • Fixed photovoltaic module, polycrystalline cell, 19 Inverter;
  • 35kV substation;
  • 35kV transmission line 9.9km long.

Description of actual services provided by our staff within the assignment:

  • Geotechnical Survey for Powerplant, 35kV substation and transmission line.
  • Feasibility study;

 