Consultant Survey, Design

Song Lo 3 Hydropower Plant (Ha Giang Province) - Capacity 22MW

Song Lo 3 Hydropower Plant (Ha Giang Province) - Capacity 22MW

VCE provided comprehensive consultant survey and design services for Song Lo 3 Hydropower Plant, located in Ha Giang Province, with an installed capacity of 22MW.

VCE provided comprehensive consultant survey and design services for Song Lo 3 Hydropower Plant, located in Ha Giang Province, with an installed capacity of 22MW, covering pre-feasibility, feasibility, and detailed construction design stages.

PROJECTS RELATED