Consultant Survey, Design

Suoi Sap 2A Hydropower Plant (Son La Province) - Capacity 49.6MW

Suoi Sap 2A Hydropower Plant (Son La Province) - Capacity 49.6MW

VCE provided comprehensive consultant survey and design services for Suoi Sap 2A Hydropower Plant, located in Son La Province, with an installed capacity of 49.6MW.

VCE provided comprehensive consultant survey and design services for Suoi Sap 2A Hydropower Plant, located in Son La Province, with an installed capacity of 49.6MW. The project is part of a cascade development on the Suoi Sap river system in the Northwest region.

PROJECTS RELATED