Cẩm Hòa Solar Power Plant (Cẩm Xuyên District, Hà Tĩnh Province) was developed by Tập đoàn Hoành Sơn and was completed and began generating electricity in 2019.
The project has an installed capacity of 50 MW and average annual generation of 61 million kWh. Its land area is approximately 60 ha.
The plant comprises 152,670 Trina Solar Tallmax TSM-PE14A polycrystalline modules rated at 325 Wp. The project is connected to the national grid through a 110 kV line, 17.1 km long, from Cẩm Hòa Commune to Cẩm Hưng Commune.
Contracting entity: Công ty CP Điện mặt trời Hà Tĩnh
Contract number: 86/2018/HĐTV-TKXD
Scope of work: Technical design, design and shop drawings, and cost estimates for the 22/110 kV step-up substation, the extension of the 110 kV outgoing bay at Cẩm Xuyên, and the 110 kV line connecting to the national grid.